千幸萬苦, 終於找到coca codo sinclair
的水力發電機形式,
由聯合國CDM文件中, 發現一些說明:
是pelton turbine, 所以它應是multi jet pelton turbine,
其distributor就不像其他的方式, 建在turbine 入口前, 而是
在外圍. 下圖為典型的multi jet pelton turbine
說到leaking, 應指是distributor welding
部份有cracked.....另外是stopper. 但依
維修備忘錄, 現應是修好了.
所以它的jet nozzles就是這個樣子
個人認為, 工程上發現的問題, 依合約把它完修就是了.
會鬧出這個風波, 不就是因為厄瓜多爾醜陋的政治鬥爭,
coca codo sinclair 就是被當作鬥爭的籌碼,
我們實在沒必要誇大其中的工程的問題!
|
|
|
|
|
|
|
|
发表于 4-1-2019 11:39 AM
|
显示全部楼层
你知道吗,我看你一直在逃避,一直鸡蛋里挑骨头硬掰的傻X 样,真心同情你被我打脸打到下不了台的怂样。哭哭哒~  为什么只翻译一段,不翻译完啊?呵呵~ 是不是怕再被我打脸? 放心,我现在就来打你脸! 谷歌翻译 official notice No. AC SHC-0-3150 / 2014, of November 11, 2014, the ASOC manifests its concern and distrust in the aforementioned OAVOC, arranging SHC To perform a UT and MT control at 1 00% on all seams made in the factory for the 8 distributors. Once the control (NDT) in the welds of the factory of the unit No. 1. SHC is finished (HARBIN) reports that MT 364 indications of failures have been detected, note mentions the dimensions and depth of each of them. The representatives of HARBIN in the work, send on February 6, 2015, thedocument: "Analysis of the causes of defects of welds made in the factory of distributor # 1 Due to the above, CCS / ASOC express their great concern, not only for the total lack ofquality control of the product, which shows the absence of supervision by the manufacturer Anshan. Harbin, Bureau Sales and Sinohydto, but the issuance of documents that do not conform to reality.
不得不赞叹你的奴性,真是非一般的贱。是解放军部队的训练成果呢?还是平日城管调教有方?呵呵~ 既然你敢放 43楼的图片,说明你已经看完报告和那新闻网所有详情。 不过,你不敢放出来。(怂得好可爱,萌萌哒~) 不过不要怕,我现在就帮你放出来。 准备好你的脸,我开始打你哟!
谷歌翻译
The Comptroller found that "the company Sinohydro Corporation, for the construction of the distributors of the eight turbines of the project used materials not approved, manufactured the elements without an adequate quality control, welded additional elements for transport and handling, and welded padlocks to carry out the hydrostatic tests without applying the welding technical procedures.Also, it joined the parts of the distributors without applying heat treatments after welding, which caused that at the time of the construction, cracks of different dimensions appear in the distributors,This led to the fact that in 2015, inspections and repair welds were carried out in all the distributors and in 2018 a new inspection and repair with welding was performed on essential elements for the operation of the turbines of the hydroelectric power station. "CELEC EP invested USD 1,010,844,719.62 in this construction, however, in the first two years of operation of the hydroelectric plant, which was designed for a useful life of 50 years, the contractor has intervened twice using solder in metallic elements with low carbon content ". For one of the consultants who determined the value of the damage, this multi-million dollar figure is what the country would lose, because it would be impossible to do so without destroying the powerhouse and its entire system; The damaged parts are covered with high-strength concrete. "It is preferable to build another machine house," said the expert. The control body determined that the fissures, which cause leaks and that can collapse the entire system, were caused by the quality of the material, which did not meet the technical specifications, and the other by poor management in the transfer and transportation of the plates from China to the site of the work, and bad welds in the anchorages that allowed transportation. Defects were detected in the weld seams, both at the factory and at the installation site. According to sources linked to the control agency's investigation, one of the fundamental reasons for the poor quality of the materials was that in the process the specifications that were originally for Japanese-made steel were changed to favor Chinese-made steel. The use of this steel, which did not have the adequate alloy or the necessary resistance to withstand the pressures, was accepted by the Mexican consortium that acted as inspector of the work. The failures found in 2015 were supposedly corrected. The most affected Units were 2, 4, 7 and 8, with more than 1500 cracks each on average. Units 3 and 4 had up to four repairs. In 2015, in the stage of hydrostatic tests, Sinohydro Corporation, the construction company, welded metal plates and padlocks and after the test the welded elements were removed, and inspection detected, in addition to the fissures of the zones corresponding to the zones of welds, a crack of 38 centimeters in length in the entrance flange of the distributor of unit 3, as well as in sectors with the presence of indications in the factory welds. The fissures were reported, but the documents delivered by the contractor in the direction of Management and Inspection did not report any news in the inspection of the welds, "evidencing lack of supervision in the construction of the distributors and questioning the integrity of the documents of QA", But the repair process was also observed: "the applicable standards do not establish the number of times that a low carbon and alloy steel can be repaired by welding", since the production and the material used have different parameters. But it is industry practice, says the Comptroller General, that the repair by welding of the base material and the welding cords can be made only once. Already the welding and repair campaign of 2015 included up to three repair welds and if in 2018 it is intervening with new repair welds, "we can affirm that the fissure repair procedure, employee, was not adequate". The control body complains to CELEC EP and the Coca Codo Sinclair Business Unit, that after detecting the cracks, they have not recommended or ordered that the integral evaluation of said structures be carried out. What is your aptitude for service? What is its useful life? What is your status? What is their future behavior if they are vessels subjected to constant and intense water pressure? Questions that, according to the Comptroller's Office, still no responsible person answers the country. If this happens, if you choose to stop the operation to make a comprehensive repair, you would have to consider the amount of energy generated by Coca Codo that the country would stop receiving. If between January 2017 and July 2018 (a year and a half) the dam generated, with all its power, about 9.6 billion Kwh (an average of 505 million kilowatts per month), at an average price of 9.86 cents the kilowatt-hour, it is had that the national electrical system would stop receiving USD 49 million monthly. About USD 600 million per year. To this must be added the USD 83 million of the installation cost of the distributors. In addition, in case it is impossible to repair the dealer system with cracks and it is necessary to replace the powerhouse, it has a value of USD 1,010 '844,719. The hydroelectric power station was designed for a useful life of 50 years, but the contractor has intervened on two occasions, using welding on metal elements with low carbon content and high tenacity; causing the welds and the base material of the distributors to become more fragile. The Office of the Comptroller General states that "the consequences of this action are the responsibility of the contractor".
|
|
|
|
|
|
|
|
发表于 4-1-2019 11:45 AM
|
显示全部楼层
他是大陆炮,说别人新闻是半假半真,最假又是他提出。 |
|
|
|
|
|
|
|
发表于 4-1-2019 11:47 AM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 4-1-2019 11:57 AM
|
显示全部楼层
因为下不了台啊~
死要面子,所以还要硬掰。
我最喜欢看它那种被我不断打脸,还要装笑没事。看到关键不利自己的新闻,却怕到不敢放出来。
然后不断扯东扯西。扯起他话题来转话题。
这种脸肿肿的傻x怂样,真的好可爱~
|
|
|
|
|
|
|
|
发表于 4-1-2019 12:33 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 03:29 PM 编辑
你知道吗,我看你一直在逃避,一直鸡蛋里挑骨头硬掰的傻X样,真心同情你被我打脸打到
哈! 是你被打到猫樣了吧, 還在硬拗?
为什么只翻译一段,不翻译完啊?呵呵~
是不是怕再被我打脸?
放心,我现在就来打你脸!
笑話, 看你九不搭八的....要回你真累....不懂就只會裝懂!
自己打回自己吧....笑死人!
...official notice No. AC SHC-0-3150 / 2014, of November 11, 2014, t
所以, 這事是發生在2014, 是在建設中的工程問題.
實在不明白你, 去質疑人家建設中的工程除錯來作啥,
還真的吃飽太閒.....
which shows the absence of supervision by the manufacturer Anshan. Harbin, Bureau Sales and Sinohydto, but the issuance of documents that do not conform to reality.
有監督不週的問題吧. 你要表示甚麼?
既然你敢放 43楼的图片,说明你已经看完报告和那新闻网所有详情。
不过,你不敢放出来。(怂得好可爱,萌萌哒~)
不过不要怕,我现在就帮你放出来。
准备好你的脸,我开始打你哟!
Piak! Piak! Piak!
為何要放? 太過無關有必要嗎?
不如你自打自臉吧, 笑死人
....This led to the fact that in 2015, inspections and repair welds were carried out in all the distributors and in 2018 a new inspection and repair with welding was performed on essential elements for the operation of the turbines of the hydroelectric power station.
工程作不好, 就依合約來作修正與維護.
你貼了這麼多來作啥???
就依合約的規格, 不合規格修正至合規,
這很難理解嗎, 你再自打回自臉吧, 真的好好笑!!!!
For one of the consultants who determined the value of the damage, this multi-million dollar figure is what the country would lose, because it would be impossible to do so without destroying the powerhouse and its entire system; The damaged parts are covered with high-strength concrete. "It is preferable to build another machine house," said the expert.
那一個expert? show 出報告要完全destroy的結論!
這種鬥爭的言論你也當真!
one of the fundamental reasons for the poor quality of the materials was that in the process the specifications that were originally for Japanese-made steel were changed to favor Chinese-made steel. The use of this steel, which did not have the adequate alloy or the necessary resistance to withstand the pressures, was accepted by the Mexican consortium that acted as inspector of the work.
後面這句就不說了嗎? 想逃避了嗎? 再自打自臉啊.
獨立第三方的監督協會 Mexican consortium 都確認可用!
所以, 這根本是拿來講的, 你嘛用點腦子, 鬥爭的冬冬信到十足.
讓我想到今天馬國前任與現任政府的鬥爭, 放大檢視.....還真一個樣!!!!!
The control body complains to CELEC EP and the Coca Codo Sinclair Business Unit, that after detecting the cracks, they have not recommended or ordered that the integral evaluation of said structures be carried out......still no responsible person answers the country.
為何不敢向sinohydro求償, 靜靜不出聲.....你貼這個是要用來打臉自己嗎?
這中間當然有問題, 不敢向sinohydro求償求維修,
當然其中錯方是自己才不敢向sinohydro大聲.
causing the welds and the base material of the distributors to become more fragile. The Office of the Comptroller General states that "the consequences of this action are the responsibility of the contractor".
講這麼多, 檢方應有足夠的本錢入稟法庭, 向sinohydro求償了,
為何不作????
==================================
一個很明顯是在進行政治鬥爭的冬冬,
你在那高潮!自己掌自己的嘴啦!!!!
==================================
|
|
|
|
|
|
|
|
发表于 4-1-2019 12:35 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 01:07 PM 编辑
赛柏再也 发表于 4-1-2019 11:47 AM
现在才发现是 pelton wheel turbine?
你会不会感觉之前自己一直解释 bulb turbine的坚持很傻x?
现在事实已经很明显哦~
distributor 的铁也是中国公司制造的铁。
distributor 是中国公司制 ... 现在才发现是 pelton wheel turbine?
你会不会感觉之前自己一直解释 bulb turbine的坚持很傻x?
我沒提, 你知麼? 現我提了你才馬後炮, 還真低賤.
看你連distributor都儍儍分不清, 還有臉馬後炮, 真是笑話.
不敢說是pelton因為沒有證據, 等有了明確的証明, 我才會出擊,
不像你, 只會矇住眼睛往前衝, 被人打臉就剛好, OK!
看你這回文, 你搞不清楚狀況, 還在這馬後炮
谁告诉 nozzle?你之前就说 snail 和 turbine 出现 crack。怎么不再提 turbine 了?
|
|
|
|
|
|
|
|
发表于 4-1-2019 12:40 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 01:45 PM 编辑
赛柏再也 发表于 4-1-2019 11:47 AM
现在才发现是 pelton wheel turbine?
你会不会感觉之前自己一直解释 bulb turbine的坚持很傻x?
现在事实已经很明显哦~
distributor 的铁也是中国公司制造的铁。
distributor 是中国公司制 ... 现在事实已经很明显哦~
distributor 的铁也是中国公司制造的铁。
distributor 是中国公司制造。
distributor 也是中国公司焊接。
好了啦, Mexican Consortium 認証的鐵,
你要叫先去叫囂Mexican Consortium, 因為鐵是由它認証
Distributor 應是德國公司的產品, 我前面有貼了.
有很大的可能是在中國的廠制造.
焊接是由當地本土的工人負責, 中國公司有監督不週的問題.
|
|
|
|
|
|
|
|
发表于 4-1-2019 12:43 PM
|
显示全部楼层
赛柏再也 发表于 4-1-2019 11:47 AM
现在才发现是 pelton wheel turbine?
你会不会感觉之前自己一直解释 bulb turbine的坚持很傻x?
现在事实已经很明显哦~
distributor 的铁也是中国公司制造的铁。
distributor 是中国公司制 ...
你上面二條都被駁, 一條是監督不週.....說是垃圾品質與事實不符.
你自己再打臉自己就可以了, 我懶得打臉你!!!!
|
|
|
|
|
|
|
|
发表于 4-1-2019 12:45 PM
|
显示全部楼层
因为下不了台啊~
死要面子,所以还要硬掰。
我最喜欢看它那种被我不断打脸,还要装笑没事。看到关键不利自己的新闻,却怕到不敢放出来。
然后不断扯东扯西。扯起他话题来转话题。
这种脸肿肿的傻x怂样,真的好可爱~
現在看看, 你真的是在說自己哦
拿出一堆資料, 許多東西避而不談,
我不就是給你以其人之道, 還治你之身而己,
現在你被打臉了. 哈! 哈! 哈!
|
|
|
|
|
|
|
|
发表于 4-1-2019 12:57 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 01:03 PM 编辑
原文:
La Segunda Junta Combinada de Disputas del contrato EP favoreció a la contratista Sinohydro con una prórroga adicional de 167 días para cumplir con la entrega de la operación inicial y la entrega de la fase 1, sin haberse impuesto una penalidad por 184 días de retraso equivalente a USD 78’200.000,00.
google 翻譯:
The Second Combined Board of Disputes of the EP contract favored the contractor Sinohydro with an additional extension of 167 days to comply with the delivery of the initial operation and the delivery of phase 1, without having imposed a penalty for 184 days of delay equivalent to USD 78'200,000.00.
怎麼這個冬冬你不肯提出與貼出來,
連仲裁庭都讓Sinohydro在這些事件上,
可以省回USD 78,200,000 (七千八百二十萬美金)
仲裁庭都favored Sinohydro, 這個 project 那一方的問題
較大不就是很明顯了嗎.....
|
|
|
|
|
|
|
|
发表于 4-1-2019 01:03 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 02:13 PM 编辑
怎麼都只是出具中國不利之事來說,
有文章也說Sinohyro己向法庭請求支付欠款.
如果是中方理虧, 怎敢向法庭申請要求支付.
用點腦袋啦.....不用腦, 很容易讓人重重反打你的臉! OK.
以下這個還回你, 自己享用吧:
|
|
|
|
|
|
|
|
发表于 4-1-2019 01:36 PM
|
显示全部楼层
看來你真的很想打我臉, 但要打我臉, 先把工課作好吧, OK!
不要自己意淫的paik paik paik
|
|
|
|
|
|
|
|
发表于 4-1-2019 01:41 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 01:43 PM 编辑
赛柏再也 发表于 4-1-2019 11:47 AM
现在才发现是 pelton wheel turbine?
你会不会感觉之前自己一直解释 bulb turbine的坚持很傻x?
现在事实已经很明显哦~
distributor 的铁也是中国公司制造的铁。
distributor 是中国公司制 ...
還有這個:
Los rodetes de las unidades U4 y U6 presentan áreas afectadas por abrasión y desprendimiento de la protección de carburo de tungsteno, a pesar de lo cual la contratista ha rechazado las solicitudes emitidas por CELEC EP para su reparación, lo que ha ocasionado que a la fecha de corte de esta acción de control no se hayan resuelto las afectaciones reportadas.
譯文:
The runners of units U4 and U6 have areas affected by abrasion and shedding of tungsten carbide protection, despite which the contractor has rejected the requests issued by CELEC EP for repair, which has caused that to date of this control action has not resolved the reported damages.
承包方可以拒絶修複, 其一是不符合同, 第二個是承包方擺爛.
如果是承包方擺爛, CELEC EP可以上庭要求對方執行合約條文或進行賠償.
不過, 以目前而言, 己有大小官員坐牢, 但對承包商仍沒法度,
看來是要求不符合約可能性較大....................
|
|
|
|
|
|
|
|
发表于 4-1-2019 01:58 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 03:32 PM 编辑
好了啦, 亂搞到此為止
就你貼的冬冬, 你先回答一個問題:
The control body complains to CELEC EP and the Coca Codo Sinclair Business Unit, that after detecting the cracks, they have not recommended or ordered that the integral evaluation of said structures be carried out. What is your aptitude for service? What is its useful life? What is your status? What is their future behavior if they are vessels subjected to constant and intense water pressure? Questions that, according to the Comptroller's Office, still no responsible person answers the country.
出了問題, 居然不向sinohydro
提出維修責任訴求與求償?
我先說我的答案 :
用簡單的推測, 這中間當然有很多的責任不在Sinohydro,
而是CELEC EP!!!!
|
|
|
|
|
|
|
|
发表于 4-1-2019 06:41 PM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 4-1-2019 07:03 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 08:09 PM 编辑
赛柏再也 发表于 4-1-2019 06:41 PM
老乌龟,我看你回复我,回复得好激动哦~
真的被我打脸打到语无伦次了。又是删,又是改的~
可惜写的都是无关痛痒傻x问题。
你前面写有问题就依合约修护,下面却写为何不敢向Sinohydro求偿求维修。你这是在自 ... 你前面写有问题就依合约修护,下面却写为何不敢向Sinohydro求偿求维修。你这是在自打脸吗?
厄瓜多尔新政府现在不就是请德国分析公司在进行检查和寻求解决方法了吗?这些检查和维修成本都是Sinohydro 承担的。
这点你是真不知,还是被我打脸打傻了?呵呵~
牛頭不對馬嘴, 問的是為何CELEC EP不作這等請求,
而現是由政府出面,不要對老XX與老XX的叫,
被打臉到語無倫次了嗎????
看清楚題目才答, OK! 不要矇著眼就在呱呱的叫!!!!
|
|
|
|
|
|
|
|
发表于 4-1-2019 07:05 PM
|
显示全部楼层
赛柏再也 发表于 4-1-2019 06:41 PM
老乌龟,我看你回复我,回复得好激动哦~
真的被我打脸打到语无伦次了。又是删,又是改的~
可惜写的都是无关痛痒傻x问题。
你前面写有问题就依合约修护,下面却写为何不敢向Sinohydro求偿求维修。你这是在自 ... 因为我给你的资料里面就已经包含 Pelton runner 和 nozzle 这些名词。 那一樓? 你給的, 你沒點出來....現在邀功? 笑死人!
|
|
|
|
|
|
|
|
发表于 4-1-2019 07:10 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 10:27 PM 编辑
赛柏再也 发表于 4-1-2019 06:41 PM
老乌龟,我看你回复我,回复得好激动哦~
真的被我打脸打到语无伦次了。又是删,又是改的~
可惜写的都是无关痛痒傻x问题。
你前面写有问题就依合约修护,下面却写为何不敢向Sinohydro求偿求维修。你这是在自 ...
19樓....你又給了甚麼確定性的說法啊, 不過是一些承包的冬冬.
一切問題當然由Sinohydro, 因其身為EPC的主要合約簽署者出面.
你給的Andritz就不會出現在調查裡頭,
因為它是和Harbin Electric Machinery簽合約!!!
先搞懂才來屁!!!!
|
|
|
|
|
|
|
|
发表于 4-1-2019 07:14 PM
|
显示全部楼层
本帖最后由 SuperKedah 于 4-1-2019 07:48 PM 编辑
赛柏再也 发表于 4-1-2019 06:41 PM
老乌龟,我看你回复我,回复得好激动哦~
真的被我打脸打到语无伦次了。又是删,又是改的~
可惜写的都是无关痛痒傻x问题。
你前面写有问题就依合约修护,下面却写为何不敢向Sinohydro求偿求维修。你这是在自 ... 你前面才承认中国监督过失啊~光是这点就已经是品控出问题~
第二,中国没按照ASME标准进行烧焊,也没按照ASME参数建造 distributor,这些都是垃圾品质的导因哦~
真佩服你还有脸继续硬掰这个现实。脸被打得疼不疼?
這些沒在驗收前發生的事, 你在屁甚麼?
還有合約有沒有這個要求.
你舉出合約的要求來看看!
如果合約沒有要求, 過後才以這項標準來屁....不要笑死人了.\
東西不能單看一面. 一個含政治鬥爭的檢驗, 看不出來就算了,
還在GGYY....
你再自打自臉一次啊, 把自己的臉打疼點.
|
|
|
|
|
|
|
| |